tjohnson doctor

Joined: 23 Aug 2010 Posts: 508 Location: Idaho Falls, Idaho  |
Posted: Tue Jun 25, 2013 4:44 pm Post subject: Xerox 510 |
 |
|
| Has anyone ever had every open interlock LED on the display lit, along with saying close cutter drawer? At times it shows an E4-04 also. The interlocks are all closed, the stacker switch is not acutated, if I do actuate it, the display says to remove the prints as it should. I am getting 3,5 12 volts out of power supply 1, no 24, but I'd imagine that is normal with the interlock open condition cutting the 24 volts. |
|
| |
|
|
|
 |
 |
 |
 |
 |
arlen resident

Joined: 30 Nov 2009 Posts: 157 Location: Salt Lake City, Utah  |
Posted: Wed Jun 26, 2013 2:23 pm Post subject: |
 |
|
| I have no experience with Xerox wide format. But I imagine they did their low voltage circuits the same as the small format stuff. You'll most likely have to grab a good interlock switch and start swapping it out with existing ones one at a time till you find the bad one. |
|
| |
|
|
|
 |
 |
 |
 |
 |
tjohnson doctor

Joined: 23 Aug 2010 Posts: 508 Location: Idaho Falls, Idaho  |
Posted: Wed Jun 26, 2013 2:59 pm Post subject: |
 |
|
| Thanks Arlen, after finding some decent wiring diagrams I think I've pinpointed it to the 24v power supply or the main board, which has a 24v power distribution circuit on it. My problem is this machine is in a secured government location where I am not allowed to be within 3.5 feet of anything over 50v. Their own employed electricians have to be called in before any cover can even be removed that has 110 inside it. Those electricians are also the ones to do the voltage checks, but without decent documentation, its impossible to tell them what voltage is on what wire. Worst nightmare of an account I've ever had. |
|
| |
|
|
|
 |
 |
 |
 |
 |
Augiedoggy resident
Joined: 21 Sep 2011 Posts: 168 Location: buffalo NY  |
Posted: Mon Jul 01, 2013 12:45 pm Post subject: |
 |
|
I see that issue all the time... its usually the cutter interlock not being closed all the way.
The interlocks have two switches and two independenat sets of wires going to them... sometimes the plunger in the interlock is being pushed closed enough to satisfy the one switch which tells logic that its closed but not enought for the second switch to allow the 24v to pass...just "reposition" the interlock so the actuator makes a better positive contact when the door is closed...the cutter drawer has a tendendy to develop play and the cutter can actually shift when the cutter motor activates causing the interlock to open slightly when cutting.
In my 16 years servicing about 75-100 machines I have never had a xerox mechanical interlock actually fail... sometimes the magnetic ones fail but even thats rare... its usually the magnet that shifts causing issues. |
|
| |
|
|
|
 |
 |
 |
 |
 |
tjohnson doctor

Joined: 23 Aug 2010 Posts: 508 Location: Idaho Falls, Idaho  |
Posted: Mon Jul 01, 2013 12:53 pm Post subject: |
 |
|
| Thanks for that information. I did pull that interlock out and manually actuated it. When you have seen this problem before does it show all doors are open or just the cutter door? |
|
| |
|
|
|
 |
 |
 |
 |
 |
Augiedoggy resident
Joined: 21 Sep 2011 Posts: 168 Location: buffalo NY  |
Posted: Mon Jul 01, 2013 12:58 pm Post subject: |
 |
|
well if its the cutter interlock its just that one but usually it doesnt tell you any interlock is open... your just missing the 24v light on the main board... sometimes when the drawer has too much slack it literally just opens the interlock for a second causing ll30 or sometimes other jam errors.
you can file the holes larger for the cutter drawer locking latches and remove the slack there.
the 24v is easy enought to check on the low voltage power supply at the silver box. they do fail but its not that common.
just reread your original post... you should have 24v at the power supply at idle... its switched/controlled by a relay on main board. |
|
| |
|
|
|
 |
 |
 |
 |
 |
tjohnson doctor

Joined: 23 Aug 2010 Posts: 508 Location: Idaho Falls, Idaho  |
Posted: Mon Jul 01, 2013 1:14 pm Post subject: |
 |
|
| I think I either have a problem with that relay or the 24v DC, I'd like another trip to meter some things again now that I have a wiring diagram. This machine is in a government classified vault so it takes 10 acts of God to be allowed in there. My first visit there took 2 months to get authorization and 7 people to escort me. Its a nightmare of an account. I'm not allowed within 3.5 feet of any voltage over 50 volts. Their own electricians have to be on site do do the checks on those voltages. I'm not even allowed to remove a cover |
|
| |
|
|
|
 |
 |
 |
 |
 |
Augiedoggy resident
Joined: 21 Sep 2011 Posts: 168 Location: buffalo NY  |
Posted: Mon Jul 01, 2013 1:54 pm Post subject: |
 |
|
| tjohnson wrote: |
| I think I either have a problem with that relay or the 24v DC, I'd like another trip to meter some things again now that I have a wiring diagram. This machine is in a government classified vault so it takes 10 acts of God to be allowed in there. My first visit there took 2 months to get authorization and 7 people to escort me. Its a nightmare of an account. I'm not allowed within 3.5 feet of any voltage over 50 volts. Their own electricians have to be on site do do the checks on those voltages. I'm not even allowed to remove a cover |
I honestly wouldnt deal with that kind union mentality... I have machines in a lot of secure facilities and even had to deal with being blindfolded and driven in on a golfcart but never was I told I am not capable enough to do my job and had to direct someone else to do it for me while I directed them. If it was something to do with the customers network or PC's I could see but thats just silly... |
|
| |
|
|
|
 |
 |
 |
 |
 |
mark in vegas doctor

Joined: 20 Oct 2010 Posts: 1852 Location: Las Vegas, NV  |
Posted: Mon Jul 01, 2013 2:17 pm Post subject: |
 |
|
I had to deal with that crap at a Marine Corps comm center years ago. Finally had to corner the CO to inform him that any further delays caused by his security policy would be billed at T&M rates. No more delays.....Magic _________________ Regards,
Mark
RVN 68-69
It's so nice to be insane
No one asks you to explain |
|
| |
|
|
|
 |
 |
 |
 |
 |
tjohnson doctor

Joined: 23 Aug 2010 Posts: 508 Location: Idaho Falls, Idaho  |
Posted: Tue Jul 02, 2013 5:00 pm Post subject: |
 |
|
| I'm pretty sure they held off on letting me service the machines until they could make sure the contracts are renewed. That way they at least get another year out of use until we can drop them. Other vendors are simply walking out during the 45 minute interview and job analysis you have to go through before you are allowed to start to work. Hopefully the new power supply assembly I just received will fix their issue and I'll be done with them. I haven't had to go there in 2 years, but they have owned this equipment for 4 years and this particular Xerox only has 1000 square feet on it. They use it mostly for scanning. |
|
| |
|
|
|
 |
 |
 |
 |
 |
tjohnson doctor

Joined: 23 Aug 2010 Posts: 508 Location: Idaho Falls, Idaho  |
Posted: Tue Jul 09, 2013 2:07 pm Post subject: |
 |
|
| The problem turned out to be the power supply assembly. There was no 24v out of the main power supply. |
|
| |
|
|
|
 |
 |
 |
 |
 |
mark in vegas doctor

Joined: 20 Oct 2010 Posts: 1852 Location: Las Vegas, NV  |
Posted: Tue Jul 09, 2013 2:11 pm Post subject: |
 |
|
Good thing it was under 50 volts..... _________________ Regards,
Mark
RVN 68-69
It's so nice to be insane
No one asks you to explain |
|
| |
|
|
|
 |
 |
 |
 |
 |
tjohnson doctor

Joined: 23 Aug 2010 Posts: 508 Location: Idaho Falls, Idaho  |
Posted: Tue Jul 09, 2013 5:17 pm Post subject: |
 |
|
| Well it had 110 going into it, so their electrician had to be on site, he let me do the swap out, but they kept the old part. This is a major pain, can't throw a part in, find it didn't fix it and pull it back out. Any part that has been installed in this machine now belongs to them. I sure hope we get this contract cancelled before it starts having PCQ issues, or a main board! |
|
| |
|
|
|
 |
 |
 |
 |
 |
|
 |
 |
 |
 |